Costs & Contracts // Second Level Schools Cost Limits

Date

Basic Building Cost

External Works Allowance

  Nov 1, 2009
  €990
  12.5% maximum

Jun 1, 2006

€1,230

12.5% maximum

Feb 1, 2005

€1,170

12.5% maximum

Dec 1, 2000

€1,079.28

12.5% maximum

Jun 1, 2000

IR£770

12.5% maximum

Nov 1, 1999

IR£715

12.5% maximum

Apr 1, 1999

IR£685

12.5% maximum

Jun 1, 1998

IR£635

12.5% maximum

Jan 1, 1997

IR£592

12.5% maximum

Mar 1, 1993

IR£556

12.5% maximum

Jun 1, 1995

IR£544

12.5% maximum

Apr 1, 1991

IR£532

12.5% maximum

Apr 1, 1990

IR£512

12.5% maximum

Apr 1, 1989

IR£488

12.5% maximum

Oct 1, 1987

IR£464

12.5% maximum

Oct 1, 1986

IR£448

12.5% maximum

Apr 1, 1986

IR£442

12.5% maximum

Jan 1, 1986

IR£432

12.5% maximum

Jul 1, 1985

IR£424

12.5% maximum

Apr 1, 1985

IR£404

12.5% maximum

Jul 1, 1984

IR£384

12.5% maximum

Oct 1, 1983

IR£368

12.5% maximum

Jul 1, 1983

IR£360

12.5% maximum

Apr 1, 1983

IR£352

12.5% maximum

Oct 1, 1982

IR£340

12.5% maximum

Apr 1, 1982

IR£332

12.5% maximum

Oct 1, 1981

IR£312

12.5% maximum

Jul 1, 1981

IR£306

12.5% maximum

Apr 1, 1981

IR£296

12.5% maximum

Planning and Building Unit, Department of Education and Science

Cost Limits for Second Level School Buildings

Introduction

The Planning and Building Unit of the Department of Education and Science has kept under review the movements of Second Level School building costs since the Basic Building Cost was increased to €1,170/m2 in February 2005.

As a result, it has been decided that the Cost Limits shown below will apply from 1st June 2006.

The increase allows for tender inflation since February 2006.

For Full Post Primary Cost Limit Release click here to download in PDF format.

Information in the Section: